Updrilled the three holes for mounting the tri-gear mount L02-12 to the motor mount P04-01.
The AeroVee engine arrived today. Two of the 4 boxes were damaged by UPS and looks like they taped things up along the way. I opened all of the boxes to inspect and inventory the contents. TBD if any parts are damaged or missing.
The case halves and heads have a lot of machining chips and sharp edges. Lots of smoothing and cleaning to come.